The  new clinic building is located on the west side of the cannery building at Lopez Matoes and is owned by the cannery.  The cannery has run water and electricity up to the building.  We will do all internal electrical and remodel all 3 bathrooms.  In addition, a new  roof is being installed. Internal remodeling includes a new central hall with entrances to each room. The new roof will cover the present open area and provide additional working space.

And in the beginning it wasn't much

Looking west toward the ocean. Phil and Vic in the future dental clinic. Looking at the south side of the clinic bldg.  
   
     

   And now it is even less.

Destruction begins, off with the old roof and let's add a few new doorways

We had some problems with the hyperlinks for the pictures below, so the thumbnails are not working from this point until the November pictures.  (In otherwords, you can't click on them to enlarge them, so you'll have to use your imagination.   Sorry.....

Bldg Const 2.jpg (26075 bytes) Bldg Const 1.jpg (24942 bytes) Bldg Const 4.jpg (28126 bytes)
AND THE REBUILDING STARTS

Spring and Summer 2002

march const retry.jpg (137617 bytes) MARCH CONSTRUCTION MIXER.jpg (113498 bytes) REALLY READY.jpg (108198 bytes)
The good, the bad, the ugly, (you figure it out) The walls go up New roof beams up
  Mvc-020sa.jpg (58379 bytes)
  Nancy checking union cards 
MVC-439F.JPG (65840 bytes) MVC-441F.JPG (70995 bytes) MVC-445F.JPG (62462 bytes)
Jon Tex using that young energy Boss man Baker and Dick Short figuring it out Capt Mike building a wall
MVC-447F.JPG (60152 bytes)

Equipment room.jpg (241314 bytes)

Looking west down the new hallway The equipment room takes shape
dick short april construction.jpg (91404 bytes) carryblock.jpg (85484 bytes) sticktime.jpg (82913 bytes)

The tall Mr. Short proud of his work

This feels like it is made from cement

Getting a little stick time

we are not tourist.jpg (109148 bytes) bossman working.jpg (110365 bytes)

We only look like tourists

Everyone works

Const Patrick and Hardy.jpg (29982 bytes)   const Concret Rick.jpg (48627 bytes)
Lopez's Patrick Malone with Hardy   Rick Park and the mixer
   
   
NOVEMBER 2002 CONSTRUCTION PROGRESS

These thumbnails should be working.

The sea-side patio is looking good. And more concrete is poured Are those water lines?? The El Presidente supervises the progress.

  DECEMBER 2002

   
Water pipes were the primary project in December. Those footers are  hard....!

THE FINISHED PRODUCT (almost)